ELES Office Building
You are here: Home » Project » ELES Office Building

ELES Office Building

Publish Time: 2024-09-30     Origin: Site

          

ELES Office Building


Project name: ELES Office Building.

Location: Warren, Michigan

Project Type: Office, Showroom

Project Status: Under Construction

Products: 150 series stick curtain wall system, Steel structure curtain wall

Glass partition, Automatic door.

Service: Construction drawings, Design proposals ,3D renderings

              Pre-sales on-site technical solution support, Sample proofing


Review:

1. The project is located in the Great Lakes area, where the wind speed is high and the temperature in winter is low. It has high requirements for the thermal insulation performance and low temperature resistance of the product, and the project is located next to the highway, so a certain sound insulation effect is required.


2. On theirs website, the sentence that stands out which is“Our main goal is to access the needs of any home through our quality and wide selection of our products!” Just like us at Topbright, we are committed to providing high quality products at reasonable prices to our customers


3. The design style of this building is very unique. The stick curtain wall is linked with the stainless steel structure. The hollow stainless steel structure design makes the whole system special. At the same time, because connecting with the curtain wall, it greatly improves the wind resistance of the whole system.


Challenge:


1.The curtain wall system is a combination of aluminum profile and stainless steel, designed with an integrated steel structure that bears the overall load. It has a height of 7.5 meters and can withstand wind pressure of up to 1.7 kPa..


2.The project must be cost-effective, with potential cost savings of up to 80% compared to local expenses.


3. The client changed the designer midway through the project.


Solution:


1.Topbright team developed a stainless steel structure system with a width of 550mm, which is combined with the 150 series stick curtain wall to provide sufficient load-bearing capacity for the 7.5-meter high glass curtain wall, meeting wind pressure requirements (1.7Kap) while maintaining an attractive aesthetic.


2.Combine our company's supply chain management system to ensure competitive pricing.


3. Our team in United State visited the client on-site to discuss project requirements, solved the connection issues between the aluminum profiles and steel structure, provided technical support for strengthening the connecting parts.


Product Used:


                 


ELE Showroom Installation Updated.


1. Project Overview

The Warren, Michigan showroom project is currently at the installation phase, where Steel structure curtain wall is being installed by a local outsourced team. This system was chosen for its modern design and ease of assembly, making it an ideal fit for both the office and showroom setup. The team has praised the straightforward installation process, which has allowed the project to progress smoothly and on time.

Key advantage: the modularity of the system reduces the need for on-site adjustments, speeding up the overall workflow.


2. Challenges and Solutions During Installation

Tight Deadlines: Due to the project’s fast pace, meeting deadlines was initially a concern. However, by utilizing pre-engineered components, the curtain wall system was installed efficiently, reducing on-site work.

Local Collaboration: Coordinating with local contractors required regular communication and flexibility. This was managed through daily briefings, ensuring everyone stayed aligned with the specifications and goals.

Weather Adjustments: Unpredictable weather required adaptive scheduling. Thanks to the flexible nature of the curtain wall system, the team could adjust their work schedule around the weather, avoiding any major setbacks.


3. Product and Brand Recognition

Installation Efficiency: Contractors noted that the Topbright curtain wall system significantly reduced installation time and labor costs. This is a testament to our commitment to delivering products that simplify on-site work.

Product Quality: The stainless steel pillars used in the structure were recognized for their durability and aesthetic appeal, meeting both the functional and visual demands of the project.

Brand Trust: Our brand’s reputation in the North American market continues to grow as clients acknowledge our products' reliability and superior quality. This project strengthens Topbright’s standing as a trusted supplier in the construction industry.


This Michigan showroom project is advancing smoothly with the installation ofSteel structure curtain wall, managed by a local installation team. This modern system simplifies installation, saving time and labor costs, while maintaining high quality standards. The project has faced challenges like tight deadlines and unpredictable weather, but our flexible solutions have kept it on track. The durability and ease of installation have earned recognition from both contractors and clients, reinforcing Topbright’s growing reputation in the North American market.


     


     


Ready to partner with a trusted leader in curtain wall systems? Contact us today to learn how our solutions can elevate your next project.

Related projects

Guangzhou Topbright Building Materials Co., Ltd.

CONTACT US

  E-mail:  project@cntopbright.com
  Tel: (313) 558-7555 

  Address: Room 907,CaiHui Information&Science Building A,No 98 Yuexi North Road , Baiyun District,Guangzhou China

Copyrights  2020 Guangzhou Topbright Building Materials CO.,Ltd. Sitemap