Double-tree Hotel by Hilton
You are here: Home » Project » Double-tree Hotel by Hilton

Double-tree Hotel by Hilton

Publish Time: 2023-08-26     Origin: Site



     



     


     



Double-tree Hotel by Hilton

Location: Perth, Australia

Project Type: Hotel

Project Status: Finished in 2018

Products: Unitized Curtain Wall, Glass Partition

Service: Structural load calculations,Shop Drawing, Coordinate with installer, Sample proofing


Review:

DoubleTree Hotel by Hilton in Perth, Australia is a luxurious hotel(an 18-story, 229-room project finished in 2018) located in the heart of the city. The hotel features stunning views of the Swan River and provides guests with a comfortable and elegant stay.


Topbright team used the expertise in engineering and design to create a custom solution that not only enhanced the hotel's aesthetic appeal but also provided unmatched performance and durability.


     


Challenge:

1. Sustainability and Environmental consideration, this project design to meet the Green Building Standards, it desired facade exterior wall with architectural design and aesthetics while adhering to safety and building code requirements.


2. Timeline: The project had a tight timeline, which required Topbright to work quickly and efficiently to produce the needed curtain wall panels and coordinate with the installation team to ensure timely installation, while still maintaining the highest quality standards.


3. Budget and Cost Control, this five star hotel with estimating project costs and stays within budget is a continuous challenge,while balancing quality and cost-effectiveness on materials and construction and installation methods.


Solution:

1. Energy-efficient façade materials can help in regulating the temperature within the hotel, reducing heating and cooling costs, as Perth's weather conditions are unpredictable and challenging, with high winds and rain being a common occurrence. Based on calculations by engineers and simulated tests, Topbright team designed a new unitized curtain wall system for this project.


2. To ensure project progress and enhance installation speed and accuracy, our team provides on-site installation guidance. coordinate with installer equipped with the necessary skills and knowledge to overcome challenges that may arise during the installation phase.


3. Combine Topbright's supply chain management system to ensure competitive pricing. Topbright carefully selecting the best materials(glass, hardware) and implementing an efficient system to control the budget.




Product Used:



Related projects

Guangzhou Topbright Building Materials Co., Ltd.

CONTACT US

  E-mail:  project@cntopbright.com
  Tel: (313) 558-7555 

  Address: Room 907,CaiHui Information&Science Building A,No 98 Yuexi North Road , Baiyun District,Guangzhou China

Copyrights  2020 Guangzhou Topbright Building Materials CO.,Ltd. Sitemap